Capital Improvement Projects


West Gulf Bank Road

Street
Project Updates:

A virtual public meeting for the proposed project was held on September 1 to gather feedback and answer questions from the community.

You can view the project presentation here.

View the project Roll Plot

Estimated Complete Date:

Mid 2025

Estimated Cost:

$14.2 million

Project Description: The proposed improvements consist of reconstructing West Gulf Bank Road from a two‑lane undivided roadway to a four-lane divided boulevard with modernized traffic signals at Sweetwater Lane and Airline Drive and a new signalized intersection at Cobbleshire Drive. A closed drainage system with underground storm sewers will replace the existing side ditches. Proposed improvements also include the construction of 8-foot pedestrian/bicycle paths and ramps along each side of the corridor to limit conflict points between vehicles, pedestrians, and bicyclists.
Project Benefits:

This project would address major concerns raised by community members over traffic congestion and safety.  Improvements would:

  • Expand the capacity of the roadway to meet current traffic volumes;
  • Reduce delays and bottlenecks at intersections with improvements to signals;
  • Provide safer sidewalks for pedestrians and bicyclists to reduce opportunities for crashes
  • Reduce risks of flooding of residences and businesses by expanding drainage capacity
  • Study100% Complete
  • Design50% Complete
  • Bid0% Complete
  • Construction0% Complete