Commissioner Rodney Ellis Harris County, TX, Precinct One - Investing in Improved Streets on Anderson Road

Anderson Road

Streets

NEIGHBOORHOOD:

Southwest Harris County

EST.  COMPLETION DATE:

Summer 2024

ESTIMATED NO. MILES: 1.4

Full size Project Map


PROJECT DESCRIPTION:

Every neighborhood deserves to have safe, high quality streets, no matter what ZIP Code you live in.  Reconstructing Anderson Road from Hiram Clarke to Almeda Road will include improvements to the existing roadway, drainage system, and sidewalks so that every road user can safely use the street. 

The existing asphalt road will be upgraded to a concrete roadway with added turn lanes at intersections and a new traffic signal at the Hiram Clark intersection.  To reduce street flooding, the current roadside ditches will be replaced with underground storm sewers. Sidewalks will be added to both sides of the roadway to provide safe access for pedestrians.

This project is divided into two sections: Section 1 - Hiram Clarke Drive to the Harris County Flood Control District channel.

PROJECT UPDATES:

The bid phase has concluded. Construction should begin in October.
 

PROJECT BENEFITS:

Anderson Road reconstruction will improve quality of life for everyone in the neighborhood by: 

  • Improving safety, traffic flow and reducing bottlenecks
  • Expanding access to transit, schools, businesses and other destinations
  • Making the roadway safer for people walking and driving
  • Reducing the risk of flooding by upgrading the stormwater drainage system

CONTACT EMAIL:

Capital.Projects@cp1.hctx.net


Study

100% Complete

Design

100% Complete

Bid

100% Complete

Construction

0% Complete