Anderson Road

Streets

NEIGHBOORHOOD:

Southwest Harris County

PROJECT UPDATES:

Improvements to Anderson Road are being designed. Construction should begin in mid-2021. 

EST.  COMPLETION DATE:

Summer 2022

ESTIMATED NO. MILES: 1.4

Full size Project Map


PROJECT DESCRIPTION:

Every neighborhood deserves to have safe, high quality streets, no matter what ZIP Code you live in.  Reconstructing Anderson Road from Hiram Clarke to Almeda Road will include improvements to the existing roadway, drainage system, and sidewalks so that every road user can safely use the street. 

The existing asphalt road will be upgraded to a concrete roadway with added turn lanes at intersections and a new traffic signal at the Hiram Clark intersection.  To reduce street flooding, the current roadside ditches will be replaced with underground storm sewers. Sidewalks will be added to both sides of the roadway to provide safe access for pedestrians.
 

PROJECT BENEFITS:

Anderson Road reconstruction will improve quality of life for everyone in the neighborhood by: 

  • Improving safety, traffic flow and reducing bottlenecks
  • Expanding access to transit, schools, businesses and other destinations
  • Making the roadway safer for people walking and driving
  • Reducing the risk of flooding by upgrading the stormwater drainage system

CONTACT EMAIL:

Capital.Projects@cp1.hctx.net


Study

100% Complete

Design

90% Complete

Bid

0% Complete

Construction

0% Complete